INTEC CONSULTINGCivil and Structural Design Engineering ConsultancyCivil and Structural Engineering Design Consultancy

 Case Study:   3   4   5   6   7   8   9   10   11   12   13 

Case Study: Embankment or Cutting Slopes

Subject Stabilisation of Existing Slopes via Soil Nailing
Project South Leeds Stadium Link Road
Client Leeds City Council
Engineer Mouchel Parkman
Main Contractor Interserve Project Services Ltd.
Specialist Geotechnical Contractor A&J Geotechnical Serfvices Ltd.
Date September 2005
Intec Consulting (UK) Ltd

Interpretation of site investigation data for design.

Design of soil nailed steep slopes.

 

For further information, please contact us.