INTEC CONSULTINGCivil and Structural Design Engineering ConsultancyCivil and Structural Engineering Design Consultancy

 Case Study:   3   4   5   6   7   8   9   10   11   12   13 

Case Studies

Below is a small selection of the many jobs completed by Intec Consulting (UK) Ltd. Please click on the links or photos for more details.

Earth Retaining Walls

Crib Walling

Housing Development, Mapperley, Nottingham

Gabions

Belle Vue Terrace, Leeds

King Post Walling

Sheldon Court

Anchored Retaining Walls

St. Bartholemew's Church, Churchdown, Gloucester

Reinforced Concrete and Modular Block Systems

Chantry Road. Moseley, Birmingham

Reinforced Soil

Atlantic Village, Bedford, Devon

Ground Anchors

Retaining Walls - Permanent

Felixkirk

Retaining Walls - Temporary

Talbot Street development, Nottingham

Soil Nailing

Stabilisation of Existing Retaining Walls

Wakerley Court, Leicester

Stabilisation of Existing Slopes

Torr Works Underpass, Steep Slope Stabilisation

Earth Retaining Walls

A448 Tardebigge Bridge Remedial Works, Bromsgrove

Embankments or Cutting Slopes

Stabilisation of Existing Slopes via Soil Nailing

South Leeds Stadium Link Road

Foundations

Pile Foundations

New Tredegar Regeneration Brithdir Railway Bridge